TOWNSLEY DRIVE BRIDGE #1201-0.50 & EVERETT AVENUE BRIDGE #2032-0.23

Bridge #1201-0.50 and Bridge #2032- 0.23 are in need of replacement as the existing twin multi plate pipes arches are deteriorating. The bridges will be replaced with new twin multi plate pipe arches. It is planned to complete the in house design in the near future. The total project cost is estimated at $250,000 for both bridges and it will be funded by the Warren County Engineer. The project is scheduled to start construction during the summer of 2018. The bridges are located in a subdivision just southwest of the intersection of US 22/SR 3 in Deerfi eld Township.